PERANCANGAN SISTEM SCHEDULING JOB MENGGUNAKAN DRUM BUFFER ROPE UNTUK MEMINIMASI KETERLAMBATAN ORDER DAN MANUFACTURING LEAD TIME PADA BAGIAN MACHINING MPM DI PT DIRGANTARA INDONESIA
Main Authors: | Rieswien, Rinda, Suryadhini, Pratya Poeri, Juliani, Widia |
---|---|
Format: | Article info application/pdf Journal |
Bahasa: | ind |
Terbitan: |
School of Industrial and System Engineering, Telkom University
, 2014
|
Online Access: |
http://jrsi.sie.telkomuniversity.ac.id/index.php/JRSI/article/view/13 http://jrsi.sie.telkomuniversity.ac.id/index.php/JRSI/article/view/13/8 |
Internet
http://jrsi.sie.telkomuniversity.ac.id/index.php/JRSI/article/view/13http://jrsi.sie.telkomuniversity.ac.id/index.php/JRSI/article/view/13/8
Lokasi
Koleksi | Jurnal Rekayasa Sistem & Industri (JRSI) |
---|---|
Gedung | School of Industrial and System Engineering |
Institusi | Telkom University |
Kota | KOTA BANDUNG |
Provinsi | JAWA BARAT |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |