PERHITUNGAN WAKTU BAKU DAN SIMULASI ALIRAN PROSES PRODUK SPARE PART DI CV. GRAND MANUFACTURING INDONESIA
Main Authors: | Ramadhan Sofyan, Dilan, Riyanto, Agus |
---|---|
Format: | Article PeerReviewed Book |
Bahasa: | eng |
Terbitan: |
TEKNIK INDUSTRI UNIKOM
, 2018
|
Subjects: | |
Online Access: |
http://repository.unikom.ac.id/70514/1/7.%20INAQUE%20-%20PERHITUNGAN%20WAKTU%20BAKU%20-%20FULL.pdf http://repository.unikom.ac.id/70514/ https://ojs.unikom.ac.id/index.php/inaque/article/view/1736 |
Internet
http://repository.unikom.ac.id/70514/1/7.%20INAQUE%20-%20PERHITUNGAN%20WAKTU%20BAKU%20-%20FULL.pdfhttp://repository.unikom.ac.id/70514/
https://ojs.unikom.ac.id/index.php/inaque/article/view/1736
Lokasi
Koleksi | Repository Scholar Unikom |
---|---|
Gedung | Perpustakaan UNIKOM |
Institusi | Universitas Komputer Indonesia |
Kota | BANDUNG |
Provinsi | JAWA BARAT |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |