ANALISIS RISIKO KETERLAMBATAN WAKTU PADA PROYEK (STUDI KASUS: PEMBANGUNAN JALAN TOL TRANS SUMATERA BAKAUHENI-TERBANGGI BESAR (Paket II Sidomulyo-Kotabaru Sta. 39+400 - Sta. 80+000) dan (Paket III Kotabaru-Metro Sta 80+000 – Sta. 109+000))
Main Author: | MEUTIA NADIA KARUNIA, 1215011070 |
---|---|
Format: | Bachelors NonPeerReviewed Book Report |
Terbitan: |
UNIVERSITAS LAMPUNG
, 2016
|
Subjects: | |
Online Access: |
http://digilib.unila.ac.id/24284/1/ABSTRAK%20%28ABSTRACT%29.pdf http://digilib.unila.ac.id/24284/19/SKRIPSI%20FULL.pdf http://digilib.unila.ac.id/24284/20/SKRIPSI%20TANPA%20BAB%20PEMBAHASAN.pdf http://digilib.unila.ac.id/24284/ |
Internet
http://digilib.unila.ac.id/24284/1/ABSTRAK%20%28ABSTRACT%29.pdfhttp://digilib.unila.ac.id/24284/19/SKRIPSI%20FULL.pdf
http://digilib.unila.ac.id/24284/20/SKRIPSI%20TANPA%20BAB%20PEMBAHASAN.pdf
http://digilib.unila.ac.id/24284/
Lokasi
Koleksi | Digital Repository Unila |
---|---|
Gedung | Perpustakaan Universitas Lampung |
Institusi | Universitas Lampung |
Kota | KOTA BANDAR LAMPUNG |
Provinsi | LAMPUNG |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |