Production Scheduling Proposal Using Ant Colony System, Active Scheduling and First in First Out Method (Case Study at CV. Bina Rubber Sumedang)
Main Authors: | Suhandi, Victor, Arisandhy, Vivi, Irawan, Daniel |
---|---|
Format: | Proceeding PeerReviewed Book |
Terbitan: |
, 2009
|
Subjects: | |
Online Access: |
http://repository.maranatha.edu/20849/1/Isiem%202009%20c.pdf http://repository.maranatha.edu/20849/ |
Internet
http://repository.maranatha.edu/20849/1/Isiem%202009%20c.pdfhttp://repository.maranatha.edu/20849/
Lokasi
Koleksi | Maranatha Repository System |
---|---|
Gedung | Perpustakaan Universitas Kristen Maranatha |
Institusi | Universitas Kristen Maranatha |
Kota | BANDUNG |
Provinsi | JAWA BARAT |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |