Analisis Penjadwalan Proyek dengan Jaringan Kerja dan Pengendalian Biaya Pekerjaan Pembangunan Gardu Listrik Cluster R.12 Proyek Kota Baru Parahyangan (Studi Kasus pada PT. Intan Mufakat Raya)
Internet
http://repository.maranatha.edu/20274/1/0252175_Abstract_TOC.pdfhttp://repository.maranatha.edu/20274/2/0252175_Appendices.pdf
http://repository.maranatha.edu/20274/3/0252175_Chapter1.pdf
http://repository.maranatha.edu/20274/4/0252175_Chapter2.pdf
http://repository.maranatha.edu/20274/5/0252175_Chapter3.pdf
http://repository.maranatha.edu/20274/6/0252175_Chapter4.pdf
http://repository.maranatha.edu/20274/7/0252175_Conclusion.pdf
http://repository.maranatha.edu/20274/8/0252175_Cover.pdf
http://repository.maranatha.edu/20274/9/0252175_References.pdf
http://repository.maranatha.edu/20274/
Lokasi
Koleksi | Maranatha Repository System |
---|---|
Gedung | Perpustakaan Universitas Kristen Maranatha |
Institusi | Universitas Kristen Maranatha |
Kota | BANDUNG |
Provinsi | JAWA BARAT |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |