HUBUNGAN PERSONAL FACTORS DAN JOB FACTORS DENGAN KEPATUHAN SOP PADA PEKERJA BANGUNAN (Studi Kasus Proyek Infrastruktur Jembatan X Kota Surabaya)
Main Author: | NABYLLA SHARFINA SEKAR NURRIWANTI, 101511133222 |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2019
|
Subjects: | |
Online Access: |
http://repository.unair.ac.id/92034/1/FKM%20157%2019%20Nur%20h%20ABSTRAK.pdf http://repository.unair.ac.id/92034/2/FKM%20157%2019%20Nur%20h%20DAFTAR%20ISI.pdf http://repository.unair.ac.id/92034/3/FKM%20157%2019%20Nur%20h%20DAFTAR%20PUISTAKA.pdf http://repository.unair.ac.id/92034/4/FKM%20157%2019%20Nur%20h.pdf http://repository.unair.ac.id/92034/ |
Internet
http://repository.unair.ac.id/92034/1/FKM%20157%2019%20Nur%20h%20ABSTRAK.pdfhttp://repository.unair.ac.id/92034/2/FKM%20157%2019%20Nur%20h%20DAFTAR%20ISI.pdf
http://repository.unair.ac.id/92034/3/FKM%20157%2019%20Nur%20h%20DAFTAR%20PUISTAKA.pdf
http://repository.unair.ac.id/92034/4/FKM%20157%2019%20Nur%20h.pdf
http://repository.unair.ac.id/92034/
Lokasi
Koleksi | Airlangga Institutional Repositories |
---|---|
Gedung | Perpustakaan Universitas Airlangga |
Institusi | Universitas Airlangga |
Kota | KOTA SURABAYA |
Provinsi | JAWA TIMUR |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |