PERENCANAAN ARSITEKTUR ENTERPRISE PADA PROSES PENEMPATAN PEKERJA MIGRAN INDONESIA (PMI) UNTUK PERUSAHAAN PENEMPATAN PEKERJA MIGRAN INDONESIA (P3MI) MENGGUNAKAN KERANGKA KERJA TOGAF ADM (STUDI KASUS: PT. BINA DINAMITA RAMA)
Main Author: | ILHAM DUDI ADIKARYA RAHMAD, 081511633054 |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | ind |
Terbitan: |
, 2019
|
Subjects: | |
Online Access: |
http://repository.unair.ac.id/87055/1/ABSTRAK.pdf http://repository.unair.ac.id/87055/2/DAFTAR%20ISI.pdf http://repository.unair.ac.id/87055/3/DAFTAR%20PUSTAKA.pdf http://repository.unair.ac.id/87055/4/ST.SI.%2029-19%20Rah%20p.pdf http://repository.unair.ac.id/87055/ http://lib.unair.ac.id |
Internet
http://repository.unair.ac.id/87055/1/ABSTRAK.pdfhttp://repository.unair.ac.id/87055/2/DAFTAR%20ISI.pdf
http://repository.unair.ac.id/87055/3/DAFTAR%20PUSTAKA.pdf
http://repository.unair.ac.id/87055/4/ST.SI.%2029-19%20Rah%20p.pdf
http://repository.unair.ac.id/87055/
http://lib.unair.ac.id
Lokasi
Koleksi | Airlangga Institutional Repositories |
---|---|
Gedung | Perpustakaan Universitas Airlangga |
Institusi | Universitas Airlangga |
Kota | KOTA SURABAYA |
Provinsi | JAWA TIMUR |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |