ANALISIS PENJADWALAN PRODUKSI DENGAN METODE NETWORK PLANNING (CRITICAL PATH METHOD) UNTUK MENGEFEKTIFKAN WAKTU PRODUKSI PYLON A320 PADA PROGRAM SPIRIT AEROSYSTEMS PT. DIRGANTARA INDONESIA (PERSERO)

Main Author: Fadhli Azhimi, 114010267
Format: Thesis NonPeerReviewed Book
Bahasa: eng
Terbitan: , 2016
Subjects:
Online Access: http://repository.unpas.ac.id/11817/1/Abstrak%20Skripsi.pdf
http://repository.unpas.ac.id/11817/2/BAB%20I%20Skripsi%20Revisi.pdf
http://repository.unpas.ac.id/11817/3/BAB%20II%20Skripsi%20Revisi.pdf
http://repository.unpas.ac.id/11817/4/Cover%20Skripsi.pdf
http://repository.unpas.ac.id/11817/5/Abstrak%20Skripsi.pdf
http://repository.unpas.ac.id/11817/