PENENTUAN WAKTU PEMENUHAN PESANAN PRODUK BETON DENGAN PENDEKATAN LOAD ORIENTED MANUFACTURING CONTROL (STUDI KASUS:PT IGASAR)
Main Author: | Putri, Astini |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | ind |
Terbitan: |
, 2017
|
Subjects: | |
Online Access: |
http://scholar.unand.ac.id/22244/1/Cover%20dan%20Abstrak.pdf http://scholar.unand.ac.id/22244/2/Bab%201.pdf http://scholar.unand.ac.id/22244/3/BAB%206.pdf http://scholar.unand.ac.id/22244/4/Daftar%20Pustaka.pdf http://scholar.unand.ac.id/22244/5/Tugas%20Akhir%20Ilmiah%20Utuh.pdf http://scholar.unand.ac.id/22244/ |
Internet
http://scholar.unand.ac.id/22244/1/Cover%20dan%20Abstrak.pdfhttp://scholar.unand.ac.id/22244/2/Bab%201.pdf
http://scholar.unand.ac.id/22244/3/BAB%206.pdf
http://scholar.unand.ac.id/22244/4/Daftar%20Pustaka.pdf
http://scholar.unand.ac.id/22244/5/Tugas%20Akhir%20Ilmiah%20Utuh.pdf
http://scholar.unand.ac.id/22244/
Lokasi
Koleksi | eSkripsi Universitas Andalas |
---|---|
Gedung | Perpustakaan Universitas Andalas |
Institusi | Universitas Andalas |
Kota | KOTA PADANG |
Provinsi | SUMATERA BARAT |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |