PERANCANGAN RCM UNTUK MENGURANGI DOWNTIME MESIN PADA PERUSAHAAN MANUFAKTUR ALUMINIUM
Main Authors: | Palit, Herri Christian, SUTANTO, WINNY |
---|---|
Format: | Proceeding PeerReviewed application/pdf |
Terbitan: |
, 2012
|
Subjects: | |
Online Access: |
https://repository.petra.ac.id/15871/1/Publikasi1_02031_402.pdf https://repository.petra.ac.id/15871/2/10._PERANCANGAN_RCM_UNTUK_MENGURANGI_DOWNTIME_%2D_PAPER.pdf https://repository.petra.ac.id/15871/3/10._PERANCANGAN_RCM_UNTUK_MENGURANGI_DOWNTIME_%2D_CP.pdf https://repository.petra.ac.id/15871/ |
Internet
https://repository.petra.ac.id/15871/1/Publikasi1_02031_402.pdfhttps://repository.petra.ac.id/15871/2/10._PERANCANGAN_RCM_UNTUK_MENGURANGI_DOWNTIME_%2D_PAPER.pdf
https://repository.petra.ac.id/15871/3/10._PERANCANGAN_RCM_UNTUK_MENGURANGI_DOWNTIME_%2D_CP.pdf
https://repository.petra.ac.id/15871/
Lokasi
Koleksi | Scientific Repository Petra Christian University |
---|---|
Gedung | Pusat Penelitian Universitas Kristen Petra |
Institusi | Universitas Kristen Petra Surabaya |
Kota | KOTA SURABAYA |
Provinsi | JAWA TIMUR |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |