EVALUASI PERFORMA BOILER TYPE DG 1025/182 – II 13 UNIT 10 PLTU 1 JAWA TENGAH REMBANG PADA KONDISI 300 MW DENGAN METODE LANGSUNG ( EVALUATION PERFORMANCE OF BOILER TYPE DG1025/18.2 - II 13 IN UNIT 10 PLTU 1 JAWA TENGAH REMBANG AT 300 MW LOAD USING DIRECT METHOD )

Main Authors: Pranata, Hastony Indra , Murni, Moch
Format: Thesis NonPeerReviewed application/pdf
Terbitan: , 2013
Subjects:
Online Access: http://eprints.undip.ac.id/41158/1/Cover_dsb.pdf
http://eprints.undip.ac.id/41158/2/BAB_I.pdf
http://eprints.undip.ac.id/41158/3/BAB_II.pdf
http://eprints.undip.ac.id/41158/4/BAB_III_baru3.pdf
http://eprints.undip.ac.id/41158/5/BAB_IV_.pdf
http://eprints.undip.ac.id/41158/6/BAB_V.pdf
http://eprints.undip.ac.id/41158/