Indonesia OneSearch
Gravitasi
  • Cari
  • PENGENDALIAN BIAYA DAN WAKTU M...
  • Lokasi
Cover Image

PENGENDALIAN BIAYA DAN WAKTU MENGGUNAKAN METODE KONSEP NILAI HASIL STUDI KASUS PROYEK PEMBANGUNAN GEDUNG KEJAKSAAN TINGGI JAWA TENGAH Cost and Schedule Control Using Earned Value Concept ( Case Study High Public Attorney Building Construction of Central Java )

Tersimpan di:
Main Authors: MUHARROM, MUHARROM, PARINDRAGALA, PARINDRAGALA
Format: Thesis NonPeerReviewed application/pdf
Terbitan: , 2005
Subjects:
TA Engineering (General). Civil engineering (General)
Online Access: http://eprints.undip.ac.id/34364/1/1542.pdf
http://eprints.undip.ac.id/34364/2/1542_COVER.pdf
http://eprints.undip.ac.id/34364/3/1542_ABSTRAK.pdf
http://eprints.undip.ac.id/34364/4/1542_KATA_PENGANTAR.pdf
http://eprints.undip.ac.id/34364/5/1542_BAB_I_-_II.pdf
http://eprints.undip.ac.id/34364/6/1542_chapter_III.pdf
http://eprints.undip.ac.id/34364/7/1542_chapter_IV.pdf
http://eprints.undip.ac.id/34364/8/1542_chapter_V.pdf
http://eprints.undip.ac.id/34364/9/1542_chapter_VI.pdf
http://eprints.undip.ac.id/34364/10/1542_chapter_VII.pdf
http://eprints.undip.ac.id/34364/11/1542_DAFTAR_PUSTAKA.pdf
http://eprints.undip.ac.id/34364/
  • Lokasi
  • Deskripsi
  • Daftar Isi
  • Preview
  • Tampilan Petugas

Internet

http://eprints.undip.ac.id/34364/1/1542.pdf
http://eprints.undip.ac.id/34364/2/1542_COVER.pdf
http://eprints.undip.ac.id/34364/3/1542_ABSTRAK.pdf
http://eprints.undip.ac.id/34364/4/1542_KATA_PENGANTAR.pdf
http://eprints.undip.ac.id/34364/5/1542_BAB_I_-_II.pdf
http://eprints.undip.ac.id/34364/6/1542_chapter_III.pdf
http://eprints.undip.ac.id/34364/7/1542_chapter_IV.pdf
http://eprints.undip.ac.id/34364/8/1542_chapter_V.pdf
http://eprints.undip.ac.id/34364/9/1542_chapter_VI.pdf
http://eprints.undip.ac.id/34364/10/1542_chapter_VII.pdf
http://eprints.undip.ac.id/34364/11/1542_DAFTAR_PUSTAKA.pdf
http://eprints.undip.ac.id/34364/

Lokasi

Koleksi Diponegoro University Institutional Repository
Gedung Perpustakaan Universitas Diponegoro
Institusi Universitas Diponegoro
Kota SEMARANG
Provinsi JAWA TENGAH
Kontak Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini.

Lihat Juga

  • Pengendalian biaya dan waktu pekerjaan bekisting pada proyek precast Rusunawa Bandung = Formwork cost and schedule control for Rusunawa Bandung precast project
    oleh: A. Farouk Khasougi, author
    Terbitan: (2008)
  • Optimalisasi waktu dan biaya pekerjaan bekisting untuk gedung bertingkat dengan sistem zoning (Studi kasus : Proyek Shangri-La hotel condominium Jakarta) = Optimise of time and cost of formwork for high rise building with zoning system in Shangri-La hotel condominium Jakarta project
    oleh: Muhammad Mardal, author
    Terbitan: (2008)
  • A PENGENDALIAN PROYEK KONSTRUKSI DGN METODE EARNED VALUE
    oleh: MASTRO, ISWAN
    Terbitan: (2002)
  • Faktor-faktor tahap pelaporan kinerja proyek konstruksi gedung yang berisiko pada kinerja waktu dan biaya= Performance reporting factors in building construction project which risk schedule and cost
    Terbitan: (2006)
  • Studi pengaruh efektivitas tim proyek terhadap kinerja biaya pada konstruksi gedung bertingkat = A study in effects of team effectiveness to cost performance in high rise building construction / Florentinus Nanda Wretta Mahardhika
    Terbitan: (2014)
© 2025 Perpustakaan Nasional Republik Indonesia
Loading...