Indonesia OneSearch
Gravitasi
  • Cari
  • ANALISIS TIME COST TRADE OFF P...
  • Lokasi
Cover Image

ANALISIS TIME COST TRADE OFF PADA PROYEK KONSTRUKSI The Analysis of Time Cost Trade Off on Construction Project

Tersimpan di:
Main Authors: PAMUNGKAS, RITA NAWANGSARI , HIDAYAT, RIZKI TAUFIK
Format: Thesis NonPeerReviewed application/pdf
Terbitan: , 2011
Subjects:
TA Engineering (General). Civil engineering (General)
Online Access: http://eprints.undip.ac.id/34342/1/2175.pdf
http://eprints.undip.ac.id/34342/2/2175_COVER.pdf
http://eprints.undip.ac.id/34342/3/2175_SUMMARY.pdf
http://eprints.undip.ac.id/34342/4/2175_PRELIMINARY.pdf
http://eprints.undip.ac.id/34342/5/2175_CHAPTER_I.pdf
http://eprints.undip.ac.id/34342/6/2175_CHAPTER_II.pdf
http://eprints.undip.ac.id/34342/7/2175_CHAPTER_III.pdf
http://eprints.undip.ac.id/34342/8/2175_CHAPTER_IV.pdf
http://eprints.undip.ac.id/34342/9/2175_CHAPTER_V.pdf
http://eprints.undip.ac.id/34342/10/2175_CHAPTER_VII.pdf
http://eprints.undip.ac.id/34342/11/2175_CHAPTER_VI.pdf
http://eprints.undip.ac.id/34342/12/2175_REFERENCE.pdf
http://eprints.undip.ac.id/34342/
  • Lokasi
  • Deskripsi
  • Daftar Isi
  • Preview
  • Tampilan Petugas

Internet

http://eprints.undip.ac.id/34342/1/2175.pdf
http://eprints.undip.ac.id/34342/2/2175_COVER.pdf
http://eprints.undip.ac.id/34342/3/2175_SUMMARY.pdf
http://eprints.undip.ac.id/34342/4/2175_PRELIMINARY.pdf
http://eprints.undip.ac.id/34342/5/2175_CHAPTER_I.pdf
http://eprints.undip.ac.id/34342/6/2175_CHAPTER_II.pdf
http://eprints.undip.ac.id/34342/7/2175_CHAPTER_III.pdf
http://eprints.undip.ac.id/34342/8/2175_CHAPTER_IV.pdf
http://eprints.undip.ac.id/34342/9/2175_CHAPTER_V.pdf
http://eprints.undip.ac.id/34342/10/2175_CHAPTER_VII.pdf
http://eprints.undip.ac.id/34342/11/2175_CHAPTER_VI.pdf
http://eprints.undip.ac.id/34342/12/2175_REFERENCE.pdf
http://eprints.undip.ac.id/34342/

Lokasi

Koleksi Diponegoro University Institutional Repository
Gedung Perpustakaan Universitas Diponegoro
Institusi Universitas Diponegoro
Kota SEMARANG
Provinsi JAWA TENGAH
Kontak Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini.

Lihat Juga

  • ANALISIS “TIME COST TRADE OFF” PADA PELAKSANAAN PROYEK (STUDY PEMBANGUNAN JALAN GERUNG PATUNG SAPI – MATARAM II)
    oleh: DIRTA LATIF JUNANI, DWI
    Terbitan: (2017)
  • ANALISIS PERCEPATAN WAKTU DENGAN MENGGUNAKAN METODE TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN KANTOR TERPADU SAMARINDA
    oleh: Rio, Wahyu Yusuf
    Terbitan: (2017)
  • ANALISA PERCEPATAN WAKTU DAN BIAYA PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA (lembur) MENGGUNAKAN METODE TIME COST TRADE OFF
    oleh: RANDI, SAPUTRA, et al.
    Terbitan: (2020)
  • ANALISA BIAYA DAN WAKTU DENGAN METODE TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN HOTEL ASTON PARAMOUNT MALANG
    oleh: SANI, IKTIVA
    Terbitan: (2014)
  • MANAJEMEN WAKTU, BIAYA DAN SDM PADA PROYEK AUDITORIUM UNIVERSITAS KATOLIK WIDYA MANDALA SURABAYA DENGAN MENGGUNAKAN METODE TIME COST TRADE OFF
    oleh: Kurniawan, Dadang
    Terbitan: (2019)
© 2025 Perpustakaan Nasional Republik Indonesia
Loading...