Indonesia OneSearch
Gravitasi
  • Cari
  • “ PENERAPAN CRITICAL PATH METH...
  • Lokasi
Cover Image

“ PENERAPAN CRITICAL PATH METHOD (CPM), PRECEDENCE DIAGRAM METHOD (PDM) DAN LINE OF BALANCE (LoB) PADA PEKERJAAN REPETITIF VERTIKAL DAN HORIZONTAL ”

Tersimpan di:
Main Authors: SWASTIKA A, ANGGIT , MISAEL W, HENDY
Format: Thesis NonPeerReviewed application/pdf
Terbitan: , 2009
Subjects:
TA Engineering (General). Civil engineering (General)
Online Access: http://eprints.undip.ac.id/34331/1/1971.pdf
http://eprints.undip.ac.id/34331/2/1971_COVER.pdf
http://eprints.undip.ac.id/34331/3/1971_PRELIMINARY.pdf
http://eprints.undip.ac.id/34331/4/1971_CHAPTER_I.pdf
http://eprints.undip.ac.id/34331/5/1971_CHAPTER_II.pdf
http://eprints.undip.ac.id/34331/6/1971_CHAPTER_III.pdf
http://eprints.undip.ac.id/34331/7/1971_CHAPTER_IV.pdf
http://eprints.undip.ac.id/34331/8/1971_CHAPTER_V.pdf
http://eprints.undip.ac.id/34331/9/1971_CHAPTER_VI.pdf
http://eprints.undip.ac.id/34331/10/1971_CHAPTER_VII.pdf
http://eprints.undip.ac.id/34331/
  • Lokasi
  • Deskripsi
  • Preview
  • Tampilan Petugas

Internet

http://eprints.undip.ac.id/34331/1/1971.pdf
http://eprints.undip.ac.id/34331/2/1971_COVER.pdf
http://eprints.undip.ac.id/34331/3/1971_PRELIMINARY.pdf
http://eprints.undip.ac.id/34331/4/1971_CHAPTER_I.pdf
http://eprints.undip.ac.id/34331/5/1971_CHAPTER_II.pdf
http://eprints.undip.ac.id/34331/6/1971_CHAPTER_III.pdf
http://eprints.undip.ac.id/34331/7/1971_CHAPTER_IV.pdf
http://eprints.undip.ac.id/34331/8/1971_CHAPTER_V.pdf
http://eprints.undip.ac.id/34331/9/1971_CHAPTER_VI.pdf
http://eprints.undip.ac.id/34331/10/1971_CHAPTER_VII.pdf
http://eprints.undip.ac.id/34331/

Lokasi

Koleksi Diponegoro University Institutional Repository
Gedung Perpustakaan Universitas Diponegoro
Institusi Universitas Diponegoro
Kota SEMARANG
Provinsi JAWA TENGAH
Kontak Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini.

Lihat Juga

  • ANALISIS PENJADWALAN PROYEK PADA PEKERJAAN REPETITIF PERUMAHAN T36/135 DENGAN METODE LINE OF BALANCE (LOB) DAN PRECEDENCE DIAGRAM METHOD (PDM)
    oleh: Supriani, Fepy
    Terbitan: (2023)
  • STUDI PERBANDINGAN PENJADWALAN PROYEK METODE LINE OF BALANCE (LoB) DAN PRECEDENCE DIAGRAM METHOD (PDM) PADA PEKERJAAN BERULANG (REPETITIF)
    oleh: Sanjaya, Deko
    Terbitan: (2014)
  • TUGAS AKHIR OPTIMASI WAKTU DAN BIAYA PADA JARINGAN KERJA CRITICAL PATH METHOD (CPM) DAN PRECEDEN DIAGRAM METHOD (PDM) ( Studi Kasus Rumah Susun Sederhana Sewa ( RUSUNAWA ), Kab. Karanganyar )
    oleh: YUDAKUSUMAH, TEGUH , et al.
    Terbitan: (2008)
  • PENERAPAN METODE PRECEDENCE DIAGRAM METHOD (PDM) DALAM PENJADWALAN PROYEK (STUDI KASUS: PERENCANAAN PEMBANGUNAN SARANA DAN PRASARANA UPTD BPTPH DAK)
    oleh: Adria, Haolongan, et al.
    Terbitan: (2020)
  • Penerapan Metode Precedence Diagram Methode (PDM) dalam Perencanaan Jadwal Proyek Konstruksi
    oleh: Rio, Asril
    Terbitan: (2020)
© 2025 Perpustakaan Nasional Republik Indonesia
Loading...