Indonesia OneSearch
Gravitasi
  • Cari
  • ANALISA EFEKTIFITAS ANTARA ME...
  • Lokasi
Cover Image

ANALISA EFEKTIFITAS ANTARA METODE KONSEP NILAI HASIL DENGAN METODE WORK BREAKDOWN STRUCTURE SEBAGAI PENGENDALI PROYEK Studi Kasus Gedung Pasca Sarjana Undip

Tersimpan di:
Main Authors: Mustafiril, Arief , Susanto, Eko
Format: Thesis NonPeerReviewed application/pdf
Terbitan: , 2006
Subjects:
TA Engineering (General). Civil engineering (General)
Online Access: http://eprints.undip.ac.id/34201/1/1683.pdf
http://eprints.undip.ac.id/34201/2/1683_cover.pdf
http://eprints.undip.ac.id/34201/3/1683_preliminary.pdf
http://eprints.undip.ac.id/34201/4/1683_chapter_I.pdf
http://eprints.undip.ac.id/34201/5/1683_chapter_II.pdf
http://eprints.undip.ac.id/34201/6/1683_chapter_III.pdf
http://eprints.undip.ac.id/34201/7/1683_chapter_IV.pdf
http://eprints.undip.ac.id/34201/8/1683_chapter_IV_b.pdf
http://eprints.undip.ac.id/34201/9/1683_chapter_IV_c.pdf
http://eprints.undip.ac.id/34201/10/1683_chapter_IV_d.pdf
http://eprints.undip.ac.id/34201/11/1683_chapter_V.pdf
http://eprints.undip.ac.id/34201/12/1683_reference.pdf
http://eprints.undip.ac.id/34201/
  • Lokasi
  • Deskripsi
  • Preview
  • Tampilan Petugas

Internet

http://eprints.undip.ac.id/34201/1/1683.pdf
http://eprints.undip.ac.id/34201/2/1683_cover.pdf
http://eprints.undip.ac.id/34201/3/1683_preliminary.pdf
http://eprints.undip.ac.id/34201/4/1683_chapter_I.pdf
http://eprints.undip.ac.id/34201/5/1683_chapter_II.pdf
http://eprints.undip.ac.id/34201/6/1683_chapter_III.pdf
http://eprints.undip.ac.id/34201/7/1683_chapter_IV.pdf
http://eprints.undip.ac.id/34201/8/1683_chapter_IV_b.pdf
http://eprints.undip.ac.id/34201/9/1683_chapter_IV_c.pdf
http://eprints.undip.ac.id/34201/10/1683_chapter_IV_d.pdf
http://eprints.undip.ac.id/34201/11/1683_chapter_V.pdf
http://eprints.undip.ac.id/34201/12/1683_reference.pdf
http://eprints.undip.ac.id/34201/

Lokasi

Koleksi Diponegoro University Institutional Repository
Gedung Perpustakaan Universitas Diponegoro
Institusi Universitas Diponegoro
Kota SEMARANG
Provinsi JAWA TENGAH
Kontak Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini.

Lihat Juga

  • Menganalisis Hasil Penjadwalan Proyek Bangunan Gedung Dengan Work Breakdown Structure (WBS)
    oleh: Mustikajaya, Wilson ( 0221064 )
    Terbitan: (2007)
  • Penerapan Metode Konsep Nilai Hasil (Earned Value Concept) pada Proyek Pembangunan Gedung studi kasus Thamrin Nine Project
    oleh: Shania, Christine (1521004)
    Terbitan: (2018)
  • PENERAPAN SISTEM PENGENDALIAN PROYEK DENGAN METODE KONSEP NILAI HASIL Studi kasus Proyek Bendung Kali Ketek dan Saluran Pembuang Sirih
    oleh: Martono, Wisnu
    Terbitan: (2007)
  • ANALISA PRODUKTIVITAS DAN FAKTOR YANG MEMPENGARUHI KINERJA TUKANG PADA PEKERJAAN PENGECETAN DENGAN METODE PRODUCTIVITY RATING (Studi kasus : Gedung Pasca Sarjana (GKB 4) Universitas Muhammadiyah Malang)
    oleh: Kelkusa, Fadhilah
    Terbitan: (2018)
  • ANALISIS PENGENDALIAN BIAYA DAN WAKTU DENGAN METODE KONSEP NILAI HASIL (EARNED VALUE) (Studi Kasus : Proyek Pembangunan Hotel Quin Semarang)
    oleh: RIDA, NILNA, et al.
    Terbitan: (2017)
© 2025 Perpustakaan Nasional Republik Indonesia
Loading...