TUGAS AKHIR OPTIMASI WAKTU DAN BIAYA PADA JARINGAN KERJA CRITICAL PATH METHOD (CPM) DAN PRECEDEN DIAGRAM METHOD (PDM) ( Studi Kasus Rumah Susun Sederhana Sewa ( RUSUNAWA ), Kab. Karanganyar )

Tersimpan di:
Main Authors: YUDAKUSUMAH, TEGUH , WARDHANI, SILVIA KUSUMA
Format: Thesis NonPeerReviewed application/pdf
Terbitan: , 2008
Subjects:
TA Engineering (General). Civil engineering (General)
Online Access: http://eprints.undip.ac.id/33969/1/1863.pdf
http://eprints.undip.ac.id/33969/2/1863_COVER.pdf
http://eprints.undip.ac.id/33969/3/1863_PRELIMINARY.pdf
http://eprints.undip.ac.id/33969/4/1863_CHAPTER_I.pdf
http://eprints.undip.ac.id/33969/5/1863_CHAPTER_II.pdf
http://eprints.undip.ac.id/33969/6/1863_CHAPTER_III.pdf
http://eprints.undip.ac.id/33969/7/1863_CHAPTER_IV.pdf
http://eprints.undip.ac.id/33969/8/1863_CHAPTER_V.pdf
http://eprints.undip.ac.id/33969/9/1863_CHAPTER_VI.pdf
http://eprints.undip.ac.id/33969/10/1863_CHAPTER_VII.pdf
http://eprints.undip.ac.id/33969/11/1863_CHAPTER_VIII.pdf
http://eprints.undip.ac.id/33969/12/1863_REFERENCE.pdf
http://eprints.undip.ac.id/33969/
  • Lokasi
  • Deskripsi
  • Preview
  • Tampilan Petugas

Internet

http://eprints.undip.ac.id/33969/1/1863.pdf
http://eprints.undip.ac.id/33969/2/1863_COVER.pdf
http://eprints.undip.ac.id/33969/3/1863_PRELIMINARY.pdf
http://eprints.undip.ac.id/33969/4/1863_CHAPTER_I.pdf
http://eprints.undip.ac.id/33969/5/1863_CHAPTER_II.pdf
http://eprints.undip.ac.id/33969/6/1863_CHAPTER_III.pdf
http://eprints.undip.ac.id/33969/7/1863_CHAPTER_IV.pdf
http://eprints.undip.ac.id/33969/8/1863_CHAPTER_V.pdf
http://eprints.undip.ac.id/33969/9/1863_CHAPTER_VI.pdf
http://eprints.undip.ac.id/33969/10/1863_CHAPTER_VII.pdf
http://eprints.undip.ac.id/33969/11/1863_CHAPTER_VIII.pdf
http://eprints.undip.ac.id/33969/12/1863_REFERENCE.pdf
http://eprints.undip.ac.id/33969/

Lokasi

Koleksi Diponegoro University Institutional Repository
Gedung Perpustakaan Universitas Diponegoro
Institusi Universitas Diponegoro
Kota SEMARANG
Provinsi JAWA TENGAH
Kontak Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini.

Lihat Juga

  • “ PENERAPAN CRITICAL PATH METHOD (CPM), PRECEDENCE DIAGRAM METHOD (PDM) DAN LINE OF BALANCE (LoB) PADA PEKERJAAN REPETITIF VERTIKAL DAN HORIZONTAL ”
    oleh: SWASTIKA A, ANGGIT , et al.
    Terbitan: (2009)
  • ANALISIS PERCEPATAN WAKTU DAN OPTIMALISASI BIAYA MENGGUNAKAN CRITICAL PATH METHOD (CPM) DENGAN PENAMBAHAN JAM KERJA (Studi Kasus Pembangunan RKB (Bertingkat Lantai II) SMA Negeri 4 Wira Bangsa Meulaboh)
    oleh: ASMAWARNI, NIM : 08C10203003
    Terbitan: (2013)
  • PERENCANAAN PENJADWALAN WAKTU DENGAN METODE CPM (CRITICAL PATH METHOD) (STUDI KASUS PROYEK PEMBANGUNAN GEDUNG DIAGNOSTIC DAN IPAL RUMAH SAKIT KHUSUS PARU PROVINSI SUMATERA BARAT)
    oleh: Febriyan, Ripa Putra, et al.
    Terbitan: (2020)
  • PERBANDINGAN PERENCANAAN JARINGAN KERJA ANTARA CRITICAL PATH METHOD (CPM) DAN PRESEDENCE DIAGRAM METHOD (PDM) DALAM UPAYA MENGENDALIKAN WAKTU PELAKSANAAN PROYEK
    oleh: Triwibowo, Yudhi, et al.
    Terbitan: (2002)
  • ANALISA WAKTU PENJADWALAN PROYEK DENGAN METODE CPM (CRITICAL PATH METHOD) (Studi Kasus: Proyek Pembangunan Sarana/Prasarana Pengendali Sedimen Batang Air Dingin Kota Padang Sumatera Barat)
    oleh: Edi, Pranoto, et al.
    Terbitan: (2020)
© 2025 Perpustakaan Nasional Republik Indonesia
Loading...