Tingkat efektivitas proteksi K3 pada tahapan commissioning pipa Steams Above Ground System Proyek Pembangkit Listrik Tenaga Panas Bumi (PLTP) Wayang Windu Unit 2 di PT XYZ = effectiveness level of Hse Protection to commissioning Steams Above Ground System pipe for geothermal power plant project in wayang windu unit 2 at PT XYZ
Main Authors: | Ispranto Kurnia Adhy, author, Add author: Fatma Lestari, supervisor, Add author: Zulkifli Djunaedi, author, Add author: Sitorus, Juanto, examiner, Add author: Arisman, examiner |
---|---|
Format: | Masters Bachelors |
Terbitan: |
, 2008
|
Subjects: | |
Online Access: |
https://lib.ui.ac.id/detail?id=20339814 |
Internet
https://lib.ui.ac.id/detail?id=20339814Lokasi
Koleksi | Repository Skripsi (open) Universitas Indonesia |
---|---|
Gedung | Perpustakaan Universitas Indonesia |
Institusi | Universitas Indonesia |
Kota | KOTA DEPOK |
Provinsi | JAWA BARAT |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |