PENERAPAN PENGENDALIAN PERSEDIAAN KOMPONEN PRODUK TX401SBV5 DENGAN METODE MATERIAL REQUIREMENT PLANNING (MRP) PADA PT. SURYA TOTO INDONESIA, Tbk
Main Author: | Muwahid, Adli Lutfi |
---|---|
Format: | Thesis NonPeerReviewed Book Bachelors |
Bahasa: | eng |
Terbitan: |
, 2019
|
Subjects: | |
Online Access: |
http://repository.unugha.ac.id/486/1/PENERAPAN%20PENGENDALIAN%20PERSEDIAAN%20KOMPONEN%20PRODUK%20TX401SBV5%20DENGAN%20METODE%20MATERIAL%20REQUIREMENT%20PLANNING%20%28MRP%29%20PADA%20PT.%20SURYA%20TOTO%20INDONESIA%2C%20Tbk.pdf http://repository.unugha.ac.id/486/ |
Internet
http://repository.unugha.ac.id/486/1/PENERAPAN%20PENGENDALIAN%20PERSEDIAAN%20KOMPONEN%20PRODUK%20TX401SBV5%20DENGAN%20METODE%20MATERIAL%20REQUIREMENT%20PLANNING%20%28MRP%29%20PADA%20PT.%20SURYA%20TOTO%20INDONESIA%2C%20Tbk.pdfhttp://repository.unugha.ac.id/486/
Lokasi
Koleksi | Repository UNUGHA |
---|---|
Gedung | Repository UNUGHA |
Institusi | Universitas Nahdlatul Ulama Al Ghazali (UNUGHA) Cilacap |
Kota | Cilacap |
Provinsi | JAWA TENGAH |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |