Indonesia OneSearch
Gravitasi
  • Cari
  • ANALISA PERCEPATAN WAKTU DAN B...
  • Lokasi
Cover Image

ANALISA PERCEPATAN WAKTU DAN BIAYA PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA (lembur) MENGGUNAKAN METODE TIME COST TRADE OFF

Tersimpan di:
Main Authors: RANDI, SAPUTRA, INDRA, FARNI, INDRA, KHAIDIR
Format: Thesis NonPeerReviewed Lainnya Book
Bahasa: eng
Terbitan: , 2020
Subjects:
TA Engineering (General). Civil engineering (General)
Online Access: http://repo.bunghatta.ac.id/337/1/51%20%20RANDI%20SAPUTRA%201310015211137%20COVER.PDF
http://repo.bunghatta.ac.id/337/2/51%20%20RANDI%20SAPUTRA%201310015211137%20%20abastrak.pdf
http://repo.bunghatta.ac.id/337/3/51%20%20RANDI%20SAPUTRA%201310015211137%20%20BAB%20I.PDF
http://repo.bunghatta.ac.id/337/4/51%20%20RANDI%20SAPUTRA%201310015211137%20%20BAB%20II.PDF
http://repo.bunghatta.ac.id/337/5/51%20%20RANDI%20SAPUTRA%201310015211137%20%20BAB%20III.PDF
http://repo.bunghatta.ac.id/337/6/51%20%20RANDI%20SAPUTRA%201310015211137%20%20BAB%20IV.PDF
http://repo.bunghatta.ac.id/337/7/51%20%20RANDI%20SAPUTRA%201310015211137%20%20BAB%20V.PDF
http://repo.bunghatta.ac.id/337/8/51%20%20RANDI%20SAPUTRA%201310015211137%20DAFTAR%20PUSTAKA.PDF
http://repo.bunghatta.ac.id/337/
  • Lokasi
  • Deskripsi
  • Daftar Isi
  • Preview
  • Tampilan Petugas

Internet

http://repo.bunghatta.ac.id/337/1/51%20%20RANDI%20SAPUTRA%201310015211137%20COVER.PDF
http://repo.bunghatta.ac.id/337/2/51%20%20RANDI%20SAPUTRA%201310015211137%20%20abastrak.pdf
http://repo.bunghatta.ac.id/337/3/51%20%20RANDI%20SAPUTRA%201310015211137%20%20BAB%20I.PDF
http://repo.bunghatta.ac.id/337/4/51%20%20RANDI%20SAPUTRA%201310015211137%20%20BAB%20II.PDF
http://repo.bunghatta.ac.id/337/5/51%20%20RANDI%20SAPUTRA%201310015211137%20%20BAB%20III.PDF
http://repo.bunghatta.ac.id/337/6/51%20%20RANDI%20SAPUTRA%201310015211137%20%20BAB%20IV.PDF
http://repo.bunghatta.ac.id/337/7/51%20%20RANDI%20SAPUTRA%201310015211137%20%20BAB%20V.PDF
http://repo.bunghatta.ac.id/337/8/51%20%20RANDI%20SAPUTRA%201310015211137%20DAFTAR%20PUSTAKA.PDF
http://repo.bunghatta.ac.id/337/

Lokasi

Koleksi Repository Universitas Bung Hatta
Gedung Perpustakaan Universitas Bung Hatta
Institusi universitas bung hatta
Kota KOTA PADANG
Provinsi SUMATERA BARAT
Kontak Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini.

Lihat Juga

  • OPTIMASI BIAYA DAN WAKTU PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA (LEMBUR) DIBANDINGKAN DENGAN PENAMBAHAN TENAGA KERJA MENGGUNAKAN METODE TIME COST TRADE OFF
    oleh: Pratama, Septian, et al.
    Terbitan: (2019)
  • OPTIMASI BIAYA DAN WAKTU PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA (LEMBUR) DIBANDINGKAN DENGAN PENAMBAHANTENAGA KERJA MENGGUNAKAN METODE TIME COST TRADE OFF
    oleh: Septian, Pratama, et al.
  • Analisis Percepatan Waktu Dan Biaya Proyek Konstruksi Dengan Penambahan Jam Kerja (Lembur) Menggunakan Metode Time Cost Trade Off : Studi Kasus Proyek Pembangunan Prasarana Pengendali Banjir
    oleh: Priyo, Mandiyo; Universitas Muhammadiyah Yogyakarta, et al.
    Terbitan: (2016)
  • ANALISIS WAKTU DAN BIAYA PADA CRASHING MENGGUNAKAN METODE SHIFT DAN PENAMBAHAN TENAGA KERJA (Studi Kasus : Proyek Pembangunan Lanjutan Gedung Laboratorium FKIP Universitas Jambi Tahap IV)
    oleh: Andri, Rahmat Saputra, et al.
    Terbitan: (2020)
  • ANALISA BIAYA DAN WAKTU DENGAN METODE TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN HOTEL ASTON PARAMOUNT MALANG
    oleh: SANI, IKTIVA
    Terbitan: (2014)
© 2025 Perpustakaan Nasional Republik Indonesia
Loading...