Indonesia OneSearch
Gravitasi
  • Cari
  • PERENCANAAN KEBUTUHAN TENAGA K...
  • Lokasi
Cover Image

PERENCANAAN KEBUTUHAN TENAGA KERJA DAN BAHAN/MATERIAL PADA PROYEK PEMBANGUNAN GEDUNG MUSEUM DAN RISET ENERGI & MINERAL

Tersimpan di:
Main Author: Joviza, MHD Fifin
Format: Bachelors NonPeerReviewed Book
Bahasa: eng
Terbitan: , 2015
Subjects:
TA Engineering (General). Civil engineering (General)
Online Access: http://repository.upi.edu/27245/1/TA_TS_1000781_Title.pdf
http://repository.upi.edu/27245/1/TA_TS_1000781_Abstract.pdf
http://repository.upi.edu/27245/1/TA_TS_1000781_Table_of_content.pdf
http://repository.upi.edu/27245/2/TA_TS_1000781_Chapter1.pdf
http://repository.upi.edu/27245/3/TA_TS_1000781_Chapter2.pdf
http://repository.upi.edu/27245/4/TA_TS_1000781_Chapter3.pdf
http://repository.upi.edu/27245/5/TA_TS_1000781_Chapter4.pdf
http://repository.upi.edu/27245/6/TA_TS_1000781_Chapter5.pdf
http://repository.upi.edu/27245/7/TA_TS_1000781_Bibliography.pdf
http://repository.upi.edu/27245/8/TA_TS_1000781_Appendix.pdf
http://repository.upi.edu/27245/
http://repository.upi.edu
  • Lokasi
  • Deskripsi
  • Daftar Isi
  • Preview
  • Tampilan Petugas

Internet

http://repository.upi.edu/27245/1/TA_TS_1000781_Title.pdf
http://repository.upi.edu/27245/1/TA_TS_1000781_Abstract.pdf
http://repository.upi.edu/27245/1/TA_TS_1000781_Table_of_content.pdf
http://repository.upi.edu/27245/2/TA_TS_1000781_Chapter1.pdf
http://repository.upi.edu/27245/3/TA_TS_1000781_Chapter2.pdf
http://repository.upi.edu/27245/4/TA_TS_1000781_Chapter3.pdf
http://repository.upi.edu/27245/5/TA_TS_1000781_Chapter4.pdf
http://repository.upi.edu/27245/6/TA_TS_1000781_Chapter5.pdf
http://repository.upi.edu/27245/7/TA_TS_1000781_Bibliography.pdf
http://repository.upi.edu/27245/8/TA_TS_1000781_Appendix.pdf
http://repository.upi.edu/27245/
http://repository.upi.edu

Lihat Juga

  • KAJIAN KEBUTUHAN TENAGA KERJA KONSTRUKSI PADA PROYEK PEKERJAAN PERENCANAAN DAN PEMBANGUNAN GEDUNG INSTALASI RADIOLOGI RUMAH SAKIT PARU DR. H. A. ROTINSULU
    oleh: GAMANANDA, RUDY
    Terbitan: (2014)
  • PERENCANAAN ALOKASI SUMBER DAYA TENAGA KERJA DAN MATERIAL (Studi Kasus Proyek Pembangunan Gedung Kelautan dan Perikanan Kabupaten Nagan Raya)
    oleh: Said Alamuddin, NIM : 11C10203015
    Terbitan: (2016)
  • PERENCANAAN JADWAL TENAGA KERJA DENGAN METODE PDM PADA PROYEK PEMBANGUNAN GEDUNG MUSHALLA MTsN MODEL MEULABOH (Kecamatan Johan Pahlawan Kabupaten Aceh Barat)
    oleh: ZULFITRAH ILHAM, NIM : 13302069
    Terbitan: (2013)
  • ANALISIS WAKTU DAN BIAYA PADA CRASHING MENGGUNAKAN METODE SHIFT DAN PENAMBAHAN TENAGA KERJA (Studi Kasus : Proyek Pembangunan Lanjutan Gedung Laboratorium FKIP Universitas Jambi Tahap IV)
    oleh: Andri, Rahmat Saputra, et al.
    Terbitan: (2020)
  • Analisis Variabel yang Berpengaruh terhadap Produktivitas Tenaga Kerja pada Proyek Pembangunan Gedung
    oleh: NDOLU, NOVEL RIZAT
    Terbitan: (2019)
© 2025 Perpustakaan Nasional Republik Indonesia
Loading...